London Swimming Pool Company

Design and build, without compromise

Menu
About Us
Overview
Showcase
Private Pools | Commercial Pools
News & Media
News | Media coverage | Newsletters | Events
Media Hub
Photo Library
FAQS
Answering your Questions
Blog
Insights & Views
Contacts
How to Get in Touch | Careers

London Swimming Pool Company
Unit 1, Shannon Commercial Centre
Beverley Way, New Malden, KT3 4PT
Tel 020 8605 1255

Registered in England No: 1828171
© 2017 The London Swimming Pool Company Contracting Ltd
Privacy Policy

Sitemap | Website design by Braden Threagold Ltd

Showcase

Commercial Pools » Hydrotherapy Pools

To discuss your design and build pool and spa needs, call us on 020 8605 1255 or email enquiries@londonswimmingpools.com

Advanced Hydrotherapy School Pool - Chippingham, Wiltshire

The Starfish Hydrotherapy Pool is a very large complex and is the culmination of seven years of planning and fundraising by the charity SNAP which was set up by the Rotary Club in Chippingham to make this project a reality for St Nicholas School, for children with special needs.

The Starfish Hydrotherapy Pool is a very large complex and is the culmination of seven years of planning and fundraising by the charity SNAP which was set up by the Rotary Club in Chippingham to make this project a reality for St Nicholas School, for children with special needs.

The hydrotherapy pool has been designed to allow people with disabilities and special needs to enjoy the experience and benefits of water.

The pool features the very latest technology such as an in-water interactive multi-sensory system and ultra-violet water treatment, accommodating those with allergies and breathing difficulties.

A solar panel heating system provides a large amount of the energy required to keep the pool at a constant 34 degrees celsius and greatly reduces the carbon footprint.  A mechanical hoist enables pool access for the less able-bodied and specialist designed steps assist partially sighted users. The pool cover was custom made for the unusual shape of the pool.

The Starfish Hydrotherapy Pool is located separately from St Nicholas School’s main building, which allows the wider community to use the pool.  Currently some 15 external groups are benefitting from the fantastic facilities. 

Award: SPATA Gold Award 2013 – Special Requirements Pools
Partner: Architectural Design and Project Management: Bailey Partnership

More »

Parkside Hospital - Wimbledon, London

Hydrotherapy pools can also be stunning as evidenced by this special needs pool incorporating deck level design.

Hydrotherapy pools can also be stunning as evidenced by this special needs pool incorporating deck level design.  The pool is used by the physiotherapy department for treatment programmes and sports injuries.

Award: SPATA Millennium Winner (2000) – Best Special Needs Pool
Hydraulic Design: BBS Technical Services

More »

Hydrotherapy Pool - Chelsea & Westminster, London

Chelsea & Westminster Hospital’s hydrotherapy Pool underwent complete renovation. The pool is used for rehabilitation of post-operative and injured people and the less able-bodied, enabling them to benefit from the therapeutic benefits of water.

Chelsea & Westminster Hospital’s hydrotherapy pool underwent complete renovation. The pool is used for rehabilitation of post-operative and injured people and the less able-bodied, enabling them to benefit from the therapeutic benefits of water.

The renovation project involved replacing the old interior liner with a custom-made high quality lining.   The engineers had to drill through 16 inches of concrete to accommodate all the new return and suction lines necessary for the level of circulation required for a top quality, modern hydrotherapy pool.

The plumbing had to run through the ceiling of the hospital records storage room, a space measuring 18 inches high and overcome the difficulty of bending pipes around existing ceiling supports. 

The old plant was replaced with highly efficient filters and pumps to obtain the proper turnover rate.  Glass beads filtration media was used instead of sand as they provide superior filtration and lasts longer. 

The rejuvenated facility was reopened in May 2013.

Partners: Management Contractor: Bisley Contracting

More »