London Swimming Pool Company

Design and build, without compromise

Menu
About Us
Overview
Showcase
Private Pools | Commercial Pools
News & Media
News | Media coverage | Newsletters | Events
Media Hub
Photo Library
FAQS
Answering your Questions
Blog
Insights & Views
Contacts
How to Get in Touch | Careers

London Swimming Pool Company
Unit 1, Shannon Commercial Centre
Beverley Way, New Malden, KT3 4PT
Tel 020 8605 1255

Registered in England No: 1828171
© 2017 The London Swimming Pool Company Contracting Ltd
Privacy Policy

Sitemap | Website design by Braden Threagold Ltd

Showcase

Commercial Pools » Refurbishment

To discuss your design and build pool and spa needs, call us on 020 8605 1255 or email enquiries@londonswimmingpools.com

Hydrotherapy Pool - Chelsea & Westminster, London

Chelsea & Westminster Hospital’s hydrotherapy Pool underwent complete renovation. The pool is used for rehabilitation of post-operative and injured people and the less able-bodied, enabling them to benefit from the therapeutic benefits of water.

Chelsea & Westminster Hospital’s hydrotherapy pool underwent complete renovation. The pool is used for rehabilitation of post-operative and injured people and the less able-bodied, enabling them to benefit from the therapeutic benefits of water.

The renovation project involved replacing the old interior liner with a custom-made high quality lining.   The engineers had to drill through 16 inches of concrete to accommodate all the new return and suction lines necessary for the level of circulation required for a top quality, modern hydrotherapy pool.

The plumbing had to run through the ceiling of the hospital records storage room, a space measuring 18 inches high and overcome the difficulty of bending pipes around existing ceiling supports. 

The old plant was replaced with highly efficient filters and pumps to obtain the proper turnover rate.  Glass beads filtration media was used instead of sand as they provide superior filtration and lasts longer. 

The rejuvenated facility was reopened in May 2013.

Partners: Management Contractor: Bisley Contracting

More »

Epsom College - Epsom, Surrey

We undertook refurbishment of the 21 metre pool complex, built in the 1970s at one of the finest private schools in the country. The pool was brought up to the standard of the other first-class sports facilities at the school.

We undertook refurbishment of the 21 metre pool complex, built in the 1970s at one of the finest private schools in the country.  The pool was brought up to the standard of the other first-class sports facilities at the school.

The entire pool building was retiled, as was the pool which had previously been covered in Marbelite.  The air handling and water filtration system were replaced, new starting blocks installed and a complete changing room re-fit was carried out.

Award: SPATA Silver Award 2009 – Commercial Refurbishment

More »

Trinity School - Croydon, Surrey

The old-fashioned 1960s private school pool complex was brought into the 21st Century. The comprehensive specification included adjusting the dimensions of the pool, installing electronic timing systems and scoreboard in line with FINA regulations for competition swimming.

The old-fashioned 1960s private school pool complex was brought into the 21st Century.  The comprehensive specification included adjusting the dimensions of the pool, installing electronic timing systems and scoreboard in line with FINA regulations for competition swimming.

The transformation also included a complete refit of the changing rooms and shower facilities and installed an advanced water treatment system for sparkling water quality.

Award: SPATA Gold Winner 2008

More »

Communal Pool - Brixton, London

This badly damaged 70 year old pool in a Tudor Estate was brought back to its former glory. Prior to renovation, the pool was no longer watertight, so a new shell was constructed inside the old shell, using traditional block method with a constant concrete infill.

This badly damaged 70 year old pool in a Tudor Estate was brought back to its former glory.  Prior to renovation, the pool was no longer watertight, so a new shell was constructed inside the old shell, using traditional block method with a constant concrete infill. A new filtration and water treatment system was designed and installed.

Award: SPATA Gold 2009 – Commercial Refurbishment

More »